Project Report Format for a Bank Loan (PMEGP, MUDRA, Term Loan): The Sections Banks Expect, With Page Order

Updated 2026-10-19 · 5 min read · By KyaTax
Quick answer
  • A bank project report is read in a fixed order — cost of project, means of finance, DSCR, break-even — and a report that puts those four on one page gets sanctioned faster than one that buries them.
  • Project cost must be itemised with quotations and must include working-capital margin and preliminary expenses; means of finance must add up to exactly that cost, with promoter contribution shown and sourced.
  • DSCR of 1.5 average and break-even below 60% of capacity are the two thresholds that most sanction notes quote.

Whether the scheme is PMEGP, MUDRA Tarun, Stand-Up India or an ordinary term loan, the bank's credit officer wants the same document: a project report (often called a Detailed Project Report or DPR) that proves the project costs what you say, is funded in a way that adds up, and generates enough cash to repay. Templates downloaded from the internet fail because they are generic; reports that follow the structure below pass because they answer the officer's questions in the order they are asked. This is the page order and the content of each section.

Page order of a bank-ready project report

#SectionWhat it must containWhat the officer checks
1Executive summaryName, constitution, activity, location, project cost, loan sought, promoter contribution, DSCR, break-even — on one pageWhether the four key numbers hold before reading further
2Promoter profileEducation, experience in the trade, existing business, net worth, CIBIL, Udyam and DPIIT detailsCapacity to run the unit; who stands behind the loan
3Project descriptionProduct or service, process, capacity, raw materials, utilities, manpower, location and premisesTechnical feasibility; licences needed
4Market and marketingDemand, target customers, competitors, pricing, orders or LOIs in handWhether projected sales are plausible
5Cost of projectLand/building, plant and machinery (with quotations), electrification, furniture, preliminary and pre-operative expenses, contingency, working-capital marginItemisation; nothing inflated; margin for working capital included
6Means of financePromoter contribution, term loan, subsidy (PMEGP), unsecured loans — totalling exactly the cost of projectDebt-equity; source of contribution
7Working-capital assessmentHolding periods, current assets and liabilities, limit required by the turnover method or MPBFWhether the cash-credit request is justified
8Projected profitability5–7 years: capacity utilisation, sales, costs, depreciation, interest, tax, net profitMargins consistent with the industry and with year-one reality
9Projected cash flow and balance sheetSources and uses, closing cash, balance sheet each yearCurrent ratio, TOL/TNW, no negative cash
10Repayment schedule and DSCRMoratorium, instalments, interest, DSCR each year and averageAverage ≥ 1.5, minimum ≥ 1.2
11Break-even and sensitivityBreak-even capacity and sales; DSCR with sales −10% and cost +10%Cushion against shortfall
12AssumptionsEvery rate, price, growth, holding period, interest rate, tax rate, depreciation methodDefensibility to the sanctioning committee
13AnnexuresQuotations, lease, licences, KYC, ITRs, bank statements, Udyam, quotations, CA certificate where requiredDocumentary support

Cost of project — getting it right

Means of finance — the arithmetic banks check first

Promoter contribution + term loan + subsidy (if any) + other long-term funds must equal the cost of project to the rupee. Scheme norms: PMEGP requires 10% owner contribution (5% for special categories) with the balance as bank loan, of which the subsidy portion is back-ended; MUDRA and CGTMSE term loans typically expect 15–25% promoter margin; Stand-Up India allows margin to be met partly from other scheme convergence. Show the source of contribution — savings, gold loan, family funds with a gift deed — because the officer will ask.

Projections that survive scrutiny

  1. Capacity utilisation rising gradually: 50–60% in year one to 80–85% by year three or four. Full capacity from month one is the fastest way to lose credibility.
  2. Selling price and raw-material cost from actual quotations and market rates, with modest annual escalation applied to both.
  3. Manpower at applicable minimum wages plus statutory costs.
  4. Depreciation by the written-down-value method at Income-tax rates, consistently.
  5. Interest computed on the reducing balance of the term loan and on the average utilisation of the cash-credit limit.
  6. Tax at the rate for the constitution — slab rates for a proprietorship, 25% or the concessional 22% for a company under section 115BAA.
  7. DSCR = (net profit after tax + depreciation + interest on term loan) ÷ (interest on term loan + principal instalment); show every year and the average.
  8. Break-even = fixed costs ÷ contribution per unit (or contribution margin ratio); express it as a percentage of installed capacity.

Scheme-specific notes

The Project Report tool produces the report in this exact section order from your inputs — quotations, capacity, prices, holding periods — and computes DSCR, break-even and the sensitivity table, so the officer's first four checks are answered on page one.

Common mistakes

Do it yourself in minutes — free to try, no login needed.

Open Project Report tool →

Frequently asked questions

What should a project report for a bank loan contain?

In order: executive summary with the key numbers, promoter profile, project description, market, itemised cost of project with quotations, means of finance that total the cost exactly, working-capital assessment, five-to-seven-year projected profitability, cash flow and balance sheet, repayment schedule with DSCR, break-even and sensitivity, an assumptions page and annexures.

What DSCR do banks want in a project report?

An average debt-service coverage ratio of at least 1.5 over the loan tenure and not below 1.2 in any single year. DSCR is (profit after tax + depreciation + term-loan interest) divided by (term-loan interest + principal instalment) for each year.

Is a CA-certified project report compulsory?

Not for every scheme or bank, but many branches ask for a CA or consultant certification on projections above a threshold, and PMEGP district task forces prefer it. More important than the signature is that the figures tie to quotations, ITRs and GST returns and that the assumptions are stated.

How much promoter contribution is needed?

PMEGP requires 10% of project cost (5% for special categories). MUDRA and CGTMSE-covered term loans usually expect 15–25%. Stand-Up India allows up to 15% margin with convergence of other central or state schemes. The contribution must be visible in the bank account or documented from a stated source.

General information for FY 2026-27, not professional advice for your specific case. Rules change — verify against the latest notification or ask a KyaTax expert.